Design Build
 Case Studies
  Case Study: 1
  Case Study: 2
  Case Study: 3
  Case Study: 4

TRITECH GROUP LTD.
5413 – 271 Street
Langley, BC  V4W 3Y7

tel:  (604) 607-8878
fax: (604) 607-8872
E-mail: info@tritechgroup.ca

TRITECH GROUP LTD.
3949 – 54th Avenue NE, Calgary, AB  T3J 3W5

tel:  (403) 203-4684
fax: (403) 203-4689
E-mail: info@tritechgroup.ca

Case Studies

Tritech has several years of experience with design-build projects, such as the following:

Case Study 1: East Balzac Water Supply Project (WTP and Reservoir, Balzac, AB

Case Study 2: VANOC Whistler WTP and WWTP - Nordic Centre, Whistler, BC

Case Study 3: Canmore WWTP Emergency Storage Upgrade, Canmore, BC

Case Study 4: Tsulquate Wastewater Treatment Plant, Port Hardy, BC